133
Tyram Junnel.
Hong Kong Water Works.
Detail of Work and Expenditure during the mouth endring
Length of Tunnel dreven during the
Mouth in Lirical Beet. 183.
30th of Novt 1885-
Number Classification of Labour
Outlay during
and materialo -
Rate
the Mouth-
Labour employed.
#.
مجھ
during the mouth.
Machinemen (Natives) Paid by Contract)
6
50
per shift of 8 hours.
at: 45° per foot
823
60
/33
16.5
20
Labourers.
Eineal of tennel
Smiths
oof penday
Compressors.
Store Boys.
な
Hammermen.
Eugniemen with
European Foremen
fitters and miners
407.7.
247
80
40
54
50€
20 to 30€
averaging each per
mouth.
#176.
884
83
143
151 A
Materials expended
during the mouth.
ebe
1550 Dynamite
@ #
0.62
962
SE
146
my
do
cores
326
Fuse.
0.33
109
90
17
108
#
3000 Detoriators
1.00
30
60 gale oil.
1.75
105
17
६३
??
llos.
420 Candled.
0.22
92
45
5
75 lbs. Waste
0.
/2
9
9 3
130 tona bual.
#
10.00
13.00
261
510
+
Total.
# 4568-19
742. 6. 7
Equi alent